Construction at the Kings Canyon site has not yet begun. It is anticipated for early in 2003.
Existing
Power Station: 3 diesel sets
with automatic control system. Installed capacity ~1MW, maximum demand ~650kW,
feeds into a 22kV/415V distribution system. The existing power station does
not need to be modified for this project.
PV
System Details:
Other Issues:
Kings Canyon is a major tourist area. The solar system will be installed such that tourists can view it and obtain information, yet the system will not be visible or detract from Kings Canyon itself.